Projects Around Town

2021 Handicap Ramps and Lee Street Sidewalk

Each year, the Town allocates a portion of the budget to repaving roads and updating handicap ramps for ADA compliance. In 2021, the Town completed 18 handicap ramps on roadways that will be paved in summer 2021 and installed a new section of sidewalk on Lee Street. Below are a few pictures of the project

IMG_4363[1]
IMG_4364[1]
IMG_4371[1]
IMG_4372[1]

Office Street Sidewalk Improvement (2020)

IMG_3658
IMG_3657